Summer '26 Company Vacation
Dear business partners,
Here is an overview of our upcoming company vacation period so you can plan your orders accordingly.
If you are currently working on an order or have an upcoming requirement, we encourage you to reach out to us as soon as possible so we can process everything smoothly before the break. For orders placed during the vacation period, please expect extended delivery times.
We appreciate your understanding and wish you a wonderful summer!
Warm regards,
The PLP Micos Team
| ORU 1 SIS | ORU 2 SIS | ORU 3 SIS | |
| Inputs / Outputs (quantity × range) | 3× 23–46 mm, 4× 9–24 mm | 5× 23–46 mm, 3× 9–24 mm, 1× 15–19 mm / 21–25 mm, 3× 8–12 mm |
12× 23–46 mm |
| Grommets (type and number of used grommets) | 3× rubber grommet ø 50 mm, 4× rubber grommet ø 30 mm |
5× rubber grommet ø 50 mm, 3× rubber grommet ø 30 mm, 1× PG29, 3× PG13.5 |
12× rubber grommet ø 50 mm |
| Ingress Protection | IP54 | IP54 | IP54 |
| Impact Protection | IK10 | IK10 | IK10 |
| UV Resistance | yes | yes | yes |
| Flammability Degree | V0 | V0 | V0 |
| Material | glass reinforced polyester SMC | glass reinforced polyester SMC | glass reinforced polyester SMC |
| Color | light gray RAL 7035 | light gray RAL 7035 | light gray RAL 7035 |
| Dimensions (H × W × D) | 1,200 × 390 × 350 mm | 1,200 × 550 × 350 mm | 1,600 × 550 × 350 mm |
| Weight | 39 kg | 45 kg | 53 kg |
| 8507.00/000SF | ORU 1 SIS | |
| 8508.00/000SF | ORU 2 SIS | |
| 8509.00/000SF | ORU 3 SIS |
The Fiber Distribution Hubs ORU 1 SIS, ORU 2 SIS and ORU 3 SIS are multipurpose distributors designed to terminate or connect optical cables in microducts or HDPE protecting pipes. Each unit features a hinged rack for assembly of up to 4/16/24 splice modules SAFeTNET. Their construction enables outdoor use. The pillars are intended to be installed in an open space within a trench.