Year-End Company Holiday

We would like to inform you that our entire company will be on holiday

Additionally, our production capacity for the end of the year is gradually filling up.

So if you’re still considering placing an order, please reach out as soon as possible so we can complete everything before the end of the year.

Otherwise, please expect an appropriate delay in delivery.

Thank you for your understanding.

The PLP Micos Team

2 Tips for Aerial Solution with Asymmetric Splitter Plug & Play

| Trainings & Education

The FTTH GPON Aerial Solution with Asymmetric Splitter Plug & Play 1:9 allows very easy and fast construction of GPON aerial networks with no requirements for experienced fiber optic network technicians. Check out these 2 tips on how to do it.


TIP #1: No special tools required for installing the suspension



TIP #2: Easy and fast installation of the helical for cable fixation on the pole